by user | Jan 1, 2012 | Layher Triple Wedge Head Coupler
As a more cost effective, faster and lighter alternative to an I-beam, the Triple Wedge Head Coupler from Layher ticks a long list of boxes on site. By linking a number of Allround® standards together, it creates a structure that is able to accommodate significant...
by user | Jan 1, 2012 | Layher Technical Support
The recently introduced Layher UK Technical Guide is now being brought to life with the availability of innovative design software. StrikeSoft Ltd. has worked closely with Layher to develop a drawing and estimating package – ‘Strike Alpha Allround’ – which builds on...
by user | Jan 1, 2012 | Layher UK Open Day
With a major new product focus, a chance to mingle with senior Layher personnel – and even an opportunity to learn a little about German wine – the latest Layher Open Day offered unmissable opportunities to all contracting customers and has been roundly applauded as...
by user | Jan 20, 2011 | Layher Bridging System
Recently introduced, the new Allround® bridging system has already been widely welcomed in the industry. Ideal as a footbridge or support girder for heavy loads, spans of up to 30 metres can be achieved with options such as event decking, Protect panels, child-proof...
by user | Jan 1, 2011 | Layher Allround TG60 Shoring System
Proven throughout Europe, the Layher Allround® TG60 Shoring Tower system is available in the UK and offers 30% greater efficiency than comparable solutions. “The SG4:10 compliant design interfaces with Allround® modular scaffolding and requires fewer bays and thus...