New TG60 Shoring System from Layher exceeds expectations on major project in Liverpool

The largest use in the UK to date of Layher’s recently introduced TG60 Shoring System is generating spectacular results in Liverpool where it is central to a major construction project that is seeing the largest concrete pour currently in Europe – some 11,900 m3.   The design is providing a safe, fast and versatile support system as part of the construction of a new waste water treatment plant being undertaken by Galliford, Costains and Atkins (GCA) Joint Venture for United Utilities.  Upon completion, the project will provide a total of 16 settling tanks and a duel level weir flow system, making it one of the most significant builds of its type in the country.

Layher UK

Layher Limited, Works Road, Letchworth, Hertfordshire SG6 1WL

Company Registered Number 2142812 – Registered address: George Hay, Unit 1b, Focus 4, Fourth Avenue, Letchworth, Hertfordshire SG6 2TU

© 2017 Layher UK Ltd.

Terms and Conditions

Scaffolding should always be erected by trained and qualified operatives following approved procedures. For technical advice and design support contact Layher Technical Department on 01462 475100.